Clicky

7 Best Construction Virtual Assistant Companies (2026)

<-Back to all Blogs
21 minutes read

A construction virtual assistant handles the office side of a contracting business remotely: RFI and submittal logs, vendor and subcontractor follow-up, insurance certificates, purchase orders, invoices, scheduling and closeout paperwork. The right company depends on the hours you need covered, the price you can carry and how much construction context the assistant must bring on day one.

Quick answer

  • Best overall for U.S. contractors: LatHire, from $7 per hour all inclusive, with Latin American assistants on U.S. hours and a shortlist in 24 hours.
  • Philippines-based construction admin: VA Masters.
  • Flat monthly full-time plan: Stealth Agents, from $1,600 per month.
  • U.S.-based assistants and bookkeepers: BELAY.
  • Larger offshore teams: Cloudstaff or MicroSourcing.
  • One-off bid estimate: World Estimating.

LatHire is our first pick for U.S. contractors that need a dedicated construction virtual assistant. It places Latin American assistants and operations staff who work during U.S. business hours, starting at $7 per hour. If you need a scoped estimate for one bid rather than ongoing office support, World Estimating is the better fit.

What does a construction virtual assistant do?

A construction virtual assistant works remotely on the paperwork and coordination that pile up between the bid desk and the jobsite. The work is routine but deadline-driven, which is why it tends to land on project managers and owners when nobody else owns it.

Construction office tasks a virtual assistant can take on
AreaTypical tasksWho still approves
Bid deskLogging bid invitations, tracking addenda, collecting supplier and subcontractor quotesEstimator or owner
Project officeRFI and submittal logs, meeting minutes, document control, daily report filingProject manager
ProcurementPurchase order tracking, long-lead logs, delivery follow-upBuyer or project manager
Subcontractor complianceInsurance certificates, W-9s, lien waivers, onboarding packetsContracts or risk owner
AccountsInvoice entry and matching against purchase orders, payment status follow-upController or owner
Customer and schedulingInbound calls, estimate appointments, crew and inspection schedulingOperations lead
CloseoutWarranties, manuals, punch-list status, as-built document collectionProject manager

Technical production such as quantity takeoffs, CAD drafting or BIM modeling is a different hire. A virtual assistant can keep the drawing register and route files, but measuring and modeling need a specialist.

Construction virtual assistant companies compared

Construction virtual assistant companies at a glance (prices checked November 2026)
ProviderTalent locationBest fitPublished price
1. LatHireLatin AmericaDedicated construction admin on U.S. hoursFrom $7 per hour, all inclusive
2. VA MastersPhilippinesConstruction office administration$6.50 to $14 per hour by role
3. Stealth AgentsOffshoreA flat full-time monthly planFrom $1,600 per month full time
4. BELAYUnited StatesU.S.-based assistants and bookkeepersNot published
5. CloudstaffPhilippinesLarger offshore teams with office infrastructureNot published
6. MicroSourcingPhilippinesManaged offshore teamsNot published
7. World EstimatingProject-basedA one-off estimate or takeoffQuote per project

How we ranked the providers

This is LatHire’s editorial comparison and includes our own staffing service, ranked first. We scored providers on four things: a construction or office-admin offering described on the provider’s own site, a dedicated assistant rather than a shared pool, published pricing, and working hours that overlap with a U.S. contractor’s day. Prices come from each provider’s public pages, checked in November 2026; where no price is listed we say so rather than estimate one. U.S. wage figures come from the Bureau of Labor Statistics (May 2025). Freelance marketplaces are excluded because they do not vet, manage or replace the assistant.

7 best construction virtual assistant companies

1. LatHire — Dedicated construction admin on U.S. hours

Best for: general contractors and specialty trades that want one dedicated assistant to own the project office queue during the U.S. workday.

LatHire is Latin America’s largest talent marketplace. It places virtual assistants and operations staff who work in U.S. time zones, so an RFI that arrives at 2 p.m. Central can be logged and routed the same afternoon. Assistants start at $7 per hour, all inclusive, and LatHire sends a shortlist of matched candidates within 24 hours of an intro call. Pricing and candidate profiles are on the virtual assistant page.

Use LatHire when the work repeats every week: keeping RFI and submittal logs current, chasing certificates of insurance, following up on supplier quotes, matching invoices to purchase orders and booking estimate appointments. At the shortlist stage, name the systems you use, such as Procore, Buildertrend, QuickBooks or Google Workspace, and ask candidates to complete a short sample task from your own office, for example logging three RFIs from an email thread with the correct drawing references.

To scope the role, start with a queue the assistant can complete without directing field work. Give them vendor contacts, a purchase request tracker and explicit thresholds for escalating delays. If a job blends document control and accounting, specify which workflows need separate approval and test each one.

2. VA Masters — Construction office administration from the Philippines

Best for: contractors comfortable with a Philippines-based assistant for project folders, vendor paperwork and follow-ups.

VA Masters recruits Filipino virtual assistants and has advertised construction administration roles. Its construction guide lists rates from $6.50 to $14 per hour depending on role. Give candidates a sample handoff from your own office to check writing, accuracy and working-hours fit.

For a contractor that gets calls, emails and field notes throughout the day, prioritize live overlap when the role needs to chase documents or confirm delivery dates; a Philippines-based assistant covering U.S. hours usually works a night shift. If the main task is organizing photos and records overnight, a later handoff may suit you. Ask who will sort ambiguous requests when the project manager is on site.

3. Stealth Agents — A flat full-time monthly plan

Best for: owners who want one predictable monthly price for a full-time general assistant.

Stealth Agents publishes a starting price of $1,600 per month for a full-time dedicated assistant working 160 hours a month, about $10 per hour. It is a general virtual assistant service rather than a construction specialist, so test for construction context: ask a candidate to sort a mixed inbox of RFIs, delivery notices and subcontractor invoices and say what each needs next.

4. BELAY — U.S.-based assistants and bookkeepers

Best for: contractors that require a U.S.-based assistant and are willing to pay a premium for it.

BELAY matches businesses with U.S.-based virtual assistants and financial professionals and markets construction support such as crew scheduling, subcontractor coordination and document organization. It does not publish pricing. BELAY’s assistants typically work fractional hours, so confirm the monthly hour block and what happens when a busy month runs over it.

5. Cloudstaff — Larger offshore teams

Best for: firms building a multi-person offshore back office rather than hiring one assistant.

Cloudstaff is a Philippines-headquartered offshore staffing company that supplies dedicated staff working from its offices or remotely. It does not publish prices. It suits a contractor ready to staff several roles at once, such as accounts payable, document control and scheduling, under one provider.

6. MicroSourcing — Managed offshore teams

Best for: larger contractors that want a managed offshore team with a provider handling facilities and supervision.

MicroSourcing builds managed offshore teams in the Philippines. Pricing is quoted per engagement. It is a heavier model than a single dedicated assistant, so it fits best when you can define several seats and processes up front.

7. World Estimating — A defined estimate or material takeoff

World Estimating prepares cost estimates and material takeoffs for residential, commercial and industrial projects. Use it when you have a drawing set and a bid deadline. Ask for the fee, scope by trade, marked-up quantities, assumptions and how revisions are handled if new drawings arrive.

Request a sample from the same trade and ask whether the worksheet separates measured quantities from allowances. This is especially important if your local pricing or production rates differ from the assumptions used in the estimate. Specify whether you need an estimate for internal budgeting or an export that can feed pricing in your own bid template.

Which construction tasks should you outsource first?

  • Bid desk. Delegate drawing register updates, quantity takeoffs and supplier quote collection. Assign someone internally to check scope, pricing and the final submission.
  • Project office. Start with RFI and submittal logs, meeting minutes and document control. Define who may send routine reminders and who approves formal responses.
  • Closeout. Assign someone to organize warranties, manuals, punch-list status and drawing updates. Give them a deliverable list and a single reviewer.

Start with the queue that misses deadlines most often. Use a real but sanitized work sample, give the provider your conventions and judge the output against an existing example. Track errors, response times and reviewer hours over the first two weeks.

How much does a construction virtual assistant cost?

Compare providers at the same hours. The table converts each published price to a full-time month of 160 hours and sets it against the U.S. median wage for secretaries and administrative assistants, $48,310 a year in May 2025 according to the Bureau of Labor Statistics. The U.S. figure is base pay only, before benefits, payroll taxes, equipment and office space.

Full-time construction admin support: published prices vs a U.S. hire
OptionPublished rateFull-time monthly (160 hours)Annual
U.S. administrative assistant (BLS median)$23.23 per hourAbout $4,026 (based on a 2,080-hour year)$48,310 before benefits
LatHireFrom $7 per hour, all inclusiveFrom $1,120From $13,440
VA Masters$6.50 to $14 per hour by role$1,040 to $2,240$12,480 to $26,880
Stealth AgentsFrom $1,600 per monthFrom $1,600From $19,200
BELAY, Cloudstaff, MicroSourcingNot publishedQuoteQuote

The contractor math

Take a project manager who spends 15 hours a week chasing submittals, certificates and invoices. A full-time LatHire assistant from $1,120 a month costs about $13,440 a year, roughly $34,870 less than the U.S. median admin wage before benefits are counted. The bigger return is the PM’s time: 15 hours a week is about 780 hours a year that can go back to running jobs and winning the next one. Track it simply, by counting overdue RFIs and submittals each week for a month before and after the hire.

For a project quote, such as a bid estimate, ask how many revisions are included and what a scope change costs. Use LatHire’s construction estimating comparison for a closer look at bid support and takeoff providers.

What a construction virtual assistant does on an active job

A general contractor already outsources physical work when it hires a trade subcontractor. Office outsourcing works on a different rhythm. The people doing the work may never visit the site, but they still depend on information from the superintendent, estimator, vendors and design team. A useful assignment has a reliable input, a repeatable action and a person who can approve the result. For example, the superintendent sends photographs and notes, a coordinator files them by area and date, and the project manager uses the record to resolve open items.

Dedicated staffing is a good fit when the same information carries from one week to the next. A coordinator learns how individual subcontractors respond, which reviewers are overloaded and where the current logs live. A scoped service is better when you can specify the input and desired output upfront, such as requesting a quantity takeoff for a single trade. A firm may use both on the same job. Its coordinator can manage the drawing register and route updated files to an outside estimating service during a busy bid period.

Before writing a job description, list the activities that were late, duplicated or abandoned across the last two jobs. “Help with project management” could mean 15 hours of document routing, a few hours of vendor calls and an occasional schedule update requiring specialist judgment. Those are different roles. Estimate work from sample weeks and separate tasks that require daily coverage from those that can wait for a scheduled review.

A contractor’s delegation map by project stage

Bidding and preconstruction

A bid coordinator can log invitations, confirm that every estimator has the same drawing issue, request quotes and record bid deadlines. A technical estimator can measure work, call out missing details, reconcile the issued addenda and prepare a bid worksheet with exclusions. Give each person a copy of the same bid calendar. Each request should show who owns the next action and when the pricing decision is due.

Consider a concrete subcontractor bidding two jobs in the same week. Its owner may ask a takeoff specialist to measure foundations and slabs, then send marked drawings and quantities grouped by floor or pour. Meanwhile, an admin can seek ready-mix and reinforcement quotes. The owner or lead estimator reconciles the quantities against production assumptions, determines the markup and authorizes the bid. A useful workflow makes it obvious where that final decision sits.

Procurement and mobilization

After award, someone has to convert bid assumptions into commitments. Delegate the upkeep of a vendor quote comparison, purchase request queue or long-lead log. For each item, record the required-on-site date, current promised delivery, supplier contact and next follow-up. Where the date will affect a schedule activity, ask the coordinator to alert the project manager before the material becomes overdue. The buyer or PM still approves substitutions and supplier commitments.

A remote admin can collect insurance certificates and onboarding documents against a firm-supplied checklist. Give them a place to log missing paperwork and a named contact for exceptions. An admin can recognize that a certificate is due or a document is missing, while the team member responsible for insurance or contracts decides whether an exception is acceptable. The same approach works for equipment warranties and owner-required product data.

Active construction and change tracking

An RFI log should help the team decide what to chase today. A coordinator records the location, current reviewer, due date and linked drawing. Ask them to flag the items likely to affect upcoming work, using priorities set by the superintendent. The coordinator can draft reminders and prepare the weekly open-items list. Assign the questions that require a technical interpretation to the project manager or design team.

Give change tracking a similar structure. Attach the directive or field record, note the affected area, list outstanding quotes and associate the item with the affected schedule activity when known. A remote assistant can assemble backup and keep the tracker current. The authorized team member determines entitlement, reviews the cost and sends the formal change request. The practical result is a file the decision-maker can review without digging through several inboxes.

Invoicing, handover and warranty

A clerical hire can reconcile invoices against the purchase-order log, flag obvious discrepancies and route items for approval. Establish separate responsibilities for entering an invoice, approving it and releasing payment. If vendors call with new bank details, direct the request to the person responsible for independent verification. Give the clerk a short list of exceptions and a predictable time for review.

Closeout work starts long before the final walkthrough. Maintain a list of required manuals, warranties, training records, as-built documents and signoffs, grouped by trade. A coordinator can follow up as each trade finishes and identify which items are still unavailable. Track who will review each submission and where the accepted version goes. A homeowner or facilities team should be able to find the final document using the labels your closeout index provides.

How staffing, estimating services and BIM firms charge

An hourly or monthly staffing quote buys a person’s availability and agreed coverage. Compare proposals on the same number of hours, days and overlap windows. Confirm whether the rate includes recruiting, replacement, account management and basic equipment. Ask whether software and required licenses sit on your invoice or the provider’s. Add the review hours your lead estimator, buyer or project manager will need, especially during the first month.

A project quote buys a defined output. Clarify how many drawings, trades or model areas it covers and what happens if an addendum changes the scope. Find out whether the quote includes an editable worksheet or native model, answer time for clarification requests and one round of corrections. An attractive package can become expensive if you need to pay separately for each drawing revision during a fast-moving tender.

Here is an illustrative monthly comparison. A $2,400 staffing quote plus a $120 software seat and eight internal review hours valued at $75 each totals $3,120. Three packages priced at $950 each plus four internal review hours at the same rate total $3,150. Those figures are examples, and the work would have to be comparable for the numbers to guide a decision. The staffing option provides coverage between requests, while the package option can be purchased only in months when you have work ready to send.

For office support, LatHire’s virtual assistant page shows a starting price of $7 per hour, all inclusive. Ask for a role-specific quote if you need construction software experience or independent document control. Where another provider gives only a project quote, compare the output and turnaround in writing before using any headline figure as a budget.

How to evaluate construction software experience

Ask the provider to describe a candidate’s specific workflow inside your software. Someone who uses Procore for document routing may be able to set up a submittal log and send routine reminders. A candidate who opens documents occasionally may need training to maintain reviewer assignments and overdue reports. Give both candidates the same sample submittal and ask them to explain what they would do if the specification reference or required approval date were missing.

For takeoffs, provide a sample Bluebeam drawing set with two issues and one change in scale. Ask for marked drawings, an itemized quantity sheet and a short note about how the revised issue changed the count. Look for traceability to the exact page and drawing revision. If you use STACK or PlanSwift, ask for a small export in your preferred format and test that your estimator can reconcile it against your template.

For accounting support, test with dummy vendor invoices, one duplicate and one discrepancy between a bill and a purchase order. A good candidate should identify which records can move ahead and which need approval. For scheduling support, share a sample milestone list and ask for an escalation note on a late delivery. If the role owns schedule logic or recovery scenarios, use a technical scheduling test and have your scheduler or PM judge the output.

Software access should match the actual assignment. Set up individual accounts, limit project access and document who grants publishing, vendor record or payment permissions. Establish where project data belongs and how access is removed when the contract ends. The provider should be able to tell the person doing the work whom to contact if a link is sent to the wrong recipient or a file is uploaded to the wrong project.

What to ask a provider before you sign

  • Who will do the work day to day, and can we meet that person before committing?
  • Which hours will overlap with our field office, and who covers the shared queues when the dedicated person is away?
  • What is included in the starting price, and how will the quote change if our weekly hours or deliverables change?
  • Which files, logs or models will we receive, in what formats and on what schedule?
  • What happens when a candidate needs more training or a deliverable fails the agreed acceptance criteria?
  • How do we transfer current files and open work if we change staffing or end a project?

Request concrete examples of the model you are buying. A staffing provider can show what a handover from recruiter to account manager looks like and how you report gaps. An estimating firm can show a sample worksheet and its typical scope assumptions. A BIM provider can share a model delivery checklist and issue log. You want to see how the provider handles an ordinary assignment and what it does when that assignment needs a correction.

A 30-day onboarding plan for a construction virtual assistant

Week 1. Establish one reliable queue

Select a single project and one recurring queue, such as vendor paperwork, bid addenda or submittals. Give the hire a quick tour of the project, a good finished example and a person for questions. Review work daily for the first few days. Record the rules that come up repeatedly, including which messages should be sent directly and which should be drafted for approval.

Week 2. Run a complete work cycle

Ask the hire to process the queue from intake through weekly reporting. Compare their tracker to your source documents and check a sample of at least several records. Mark where errors arose from incomplete instructions, where software access got in the way and where the person needs further coaching. Agree on whether the next review happens daily or at set times.

Weeks 3 and 4. Add volume after the handoff works

Add one adjacent workstream or a second project after the initial queue meets the agreed standard. Measure the share of due items updated on time, the number of avoidable corrections and the PM’s review time. Count time spent explaining recurring errors as part of the workload. Discuss what the hire can now own and which decisions still need escalation.

Frequently asked questions

What does a construction virtual assistant do?

A construction virtual assistant handles the office side of a contracting business remotely, including RFI and submittal logs, vendor and subcontractor follow-up, certificates of insurance, purchase orders, invoice matching, scheduling and closeout paperwork. Your project manager or owner still approves technical and contractual decisions.

What are the best construction virtual assistant companies?

LatHire is our top pick for U.S. contractors, with Latin American assistants on U.S. hours from $7 per hour all inclusive. VA Masters suits Philippines-based construction admin, Stealth Agents offers a flat full-time plan from $1,600 per month, BELAY supplies U.S.-based assistants, and Cloudstaff and MicroSourcing suit larger offshore teams.

How much does a construction virtual assistant cost?

Published rates in November 2026 start at $7 per hour all inclusive with LatHire, $6.50 to $14 per hour with VA Masters and $1,600 per month full time with Stealth Agents. For comparison, the U.S. median wage for secretaries and administrative assistants was $48,310 a year in May 2025, before benefits.

Can a construction virtual assistant work during U.S. business hours?

Yes. Latin American assistants generally work hours that overlap with U.S. Eastern and Central time, so same-day follow-up on RFIs and deliveries is realistic. Philippines-based assistants usually cover U.S. hours on a night shift. Agree a daily overlap window before work starts.

What is the difference between a construction VA and a remote estimator?

A construction VA usually handles project administration such as collecting documents, updating logs and following up with vendors. A remote estimator measures or prices scope, reconciles drawings and explains technical assumptions. If one person is expected to do both, allocate hours to each job and test both sets of skills before hiring.

What can a small contractor outsource first?

Choose a task that repeats each week and has a clear review standard. Following up on supplier quotes, maintaining a lead-time log or organizing submittals are common starting points. Assign the reviewer and the turnaround target before choosing the provider.

Can a project assistant prepare RFIs and change orders?

A trained assistant can start the record, assemble supporting documents, route drafts, chase responses and update the log. Give them examples of requests requiring escalation and identify who can send the approved document. The person making the technical or contractual decision needs the relevant context and authority.

Can a virtual assistant work in Procore, Buildertrend or QuickBooks?

Often, provided your firm issues appropriate access and the assistant has the right experience. Confirm software versions, account costs and the exact permissions needed, and test the work in a training project or with sample data before opening live documents or payment functions.

When does outsourcing stop saving time?

Review the arrangement if internal staff repeatedly redo the work, requests sit idle across shifts or the same task needs multiple rounds of correction. Check whether instructions, inputs, access or role fit are the problem. If the work changes every time and takes longer to brief than to complete, keep it with an internal owner until it can be handed off clearly.

Which provider should you shortlist?

Choose LatHire first if your project managers and owners are losing hours every week to RFIs, submittals, certificates, invoices and follow-ups and you want that work done during U.S. hours from $7 per hour. Pick VA Masters or Stealth Agents if an offshore night-shift model suits you, BELAY if the assistant must be U.S.-based, and World Estimating when you need a one-off estimate rather than an assistant.